Type: | Arrangement Palletizer |
---|---|
Automatic Grade: | Automatic |
Voltage: | 380V |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
It is used in the industries of beer food and beverage, chemical, etc., to stack various types of bottles and bags. With easy adjustment and a large production capacity, it is suitable for a variety of fascia boards and boxes. The change of production line only needs to modify the software program. Press one button to change the type of stacking and it is easy to change products. It is suitable for palletizing the packages of cartons and heat shrink film.
Main parameters
Stacking speed 2.5 cycles/min
Stacking height per pallet box height x layers/stack
Maximum load per layer 200 Kg
Maximum load per pallet 1800 Kg
Maximum stacking height 1800mm
Electric power 15.3Kw
Compressed air 600L/min
Air supply pressure ≥0.6MPa
Pallet size According to customers' requirements
Workflow
Firstly, place 10 empty pallets in the pallet dispenser by a forklift, and the pallet dispenser will transport one pallet on proper stacking position (there are three positions available); Products are transported from the packaging machine to the accelerating belt line which may enlarge the distance between two products through speed difference; the steering mechanism will change the direction of products according to their arrangement mode, and the arrangement mechanism will arrange the products in a certain order; the pushing mechanism will place the well-arranged products onto the pallets through a lifting platform. Repeat the actions until all products are stacked well. Whenever a stack of products is finished, the full pallet conveyor line will transport the products to the workstation of the forklift.
Accelerating belt line → Steering mechanism → Arrangement and buffer system
↓
Box pushing mechanism
↓
Lifting platform
↓
Finish ← Roller conveyor ← Pallet supply system
Installation environment and safety
Description Requirements
Installation environment
1) Ambient temperature 0~45°C (without air condition); 0~60°C (with control cabinet industrial air condition)
2) Ambient humidity Generally less than or equal to 75%RH, without frosting
3) Vibration No more than 0.5G
4) Other Without strong radio interference
No more than 95%RH, without frosting
Safety
1) No operator is allowed to enter into the working range of the machine. Operator and machine cannot work simultaneously within the joint operation area.
2) Guard fence shall be arranged around the working area of the machine.
3) Operators who enter into the guard fence must have safety training. The safety switch of the guard fence is treated as an emergency stop.
4) All operable control devices of the system shall be installed outside the guard fence.
5) Necessary operating conditions must be checked before automatic-start, re-start, and manual operation of a machine.
6) Other safety conditions must conform to relevant provisions of national laws.
Other safety conditions must follow the safety regulations made by users.
Electrical components
Photoelectric sensor | SICK |
Servo motor | Panasonic |
Touch screen | Siemen |
Q1:Are you a trading company or a manufacturer?
A1:We are an old filling machine company, specializing in filling machine, beverage line,water treatment, shrinking label machine and Bottle blowing machine. Now we are one of leading filling machine manufacturer in china.
Q2:What's your guarantee or the warranty of the quality if we buy machines?
A2:We provide quality machines with top brand.components and qualified material. Our warrantee time is 2 years after installation and commissioning, within 2 years the machines get quality problem, we will take full responsibility and provide services.
Q3:When can I get machine after I paid?
A3:We will deliver filling machines on time as the date we agreed both side.
Q4:How can I install my drinking water filling machine when it arrives?
A4:We will send our engineer to your side as soon as you get all your machines ready , for testing and teaching your technicians how to run the drinking water filling machines. Also supporting online installation.
Q5:What's the delivery time?
A5:50 days after the T/T deposit or L/C for unit machine.60-90days for project line.